Power Systems Positive, negative and zero sequence impedances of line are 2,2 and 5 pu respectively. Find self and mutual impedances respectively? 3 and 1 pu 2 and 2 pu 2 and 5 pu 1 and 3 pu 3 and 1 pu 2 and 2 pu 2 and 5 pu 1 and 3 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The radiation shield for a nuclear power reactor for biological safety is provided by having the reactor isolated from outside word with strong magnetic field. encased thick metal wall. immersed in water pool. encased by thick concrete wall. isolated from outside word with strong magnetic field. encased thick metal wall. immersed in water pool. encased by thick concrete wall. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal plant most of the energy is wasted in boiler turbines ESP condenser boiler turbines ESP condenser ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3 × 106 kV / sec. 3.5 × 106 kV / sec. 2 × 106 kV / sec. 1 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 2 × 106 kV / sec. 1 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the approximate efficiency of a normal thermal power station? 45-55% 20-25% 60-70% 30-40% 45-55% 20-25% 60-70% 30-40% ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main advantage of the Decoupled Load Flow (DLF) as compared to the NR method is accuracy is more All of these number of iterations are less reduced memory requirements in storing the Jacobian elements accuracy is more All of these number of iterations are less reduced memory requirements in storing the Jacobian elements ANSWER DOWNLOAD EXAMIANS APP