Power Systems In nuclear chain fission reaction each neutron causing fission produces at least one new neutron. no new neutron. one new neutron. less than one new neutron. at least one new neutron. no new neutron. one new neutron. less than one new neutron. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Demand factor of a plant is 1 0 less than 1 greater than 1 1 0 less than 1 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j6 pu j3 pu j9 pu j1 pu j6 pu j3 pu j9 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Positive, negative and zero sequence impedances of line are 2,2 and 5 pu respectively. Find self and mutual impedances respectively? 2 and 2 pu 3 and 1 pu 1 and 3 pu 2 and 5 pu 2 and 2 pu 3 and 1 pu 1 and 3 pu 2 and 5 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LLG LG LLL LL LLG LG LLL LL ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following transmission lines capacitance effect is negligible? both 1 and 3 long transmission lines shoart transmission lines medium transmission lines both 1 and 3 long transmission lines shoart transmission lines medium transmission lines ANSWER DOWNLOAD EXAMIANS APP