Power Systems A power station plant load factor is defined as the ratio of the energy generated to that of maximum energy that could have been generated minimum load to peak load average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated minimum load to peak load average load to the peak load minimum load to average load ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mercury is choice with steam in binary vapor cycle because relative low vaporization pressure. all of above. higher critical temperature and pressure. higher saturation temperature than other fluids. relative low vaporization pressure. all of above. higher critical temperature and pressure. higher saturation temperature than other fluids. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by atomic power station of the same output. less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. less than that required by atomic power station of the same output. less than that required by the diesel power station of same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Condenser. Cooling tower. Pulversing unit. Ash handling unit. Condenser. Cooling tower. Pulversing unit. Ash handling unit. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Merze price current scheme protection is used in transformer. alternator. both A and B. bus bars. transformer. alternator. both A and B. bus bars. ANSWER DOWNLOAD EXAMIANS APP