Power Systems Which of following generating plants has the minimum operating cost Nuclear plant. Steam plant. Hydroelectric plant. Diesel plant. Nuclear plant. Steam plant. Hydroelectric plant. Diesel plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U238 and Th232. None of these. U235 and Th239. U235, U233 and Pu239. U238 and Th232. None of these. U235 and Th239. U235, U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is low specific speed turbine? Kaplan Francis None of these Pelton Kaplan Francis None of these Pelton ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 10.936 pu 8.936 pu 7.936 pu 9.936 pu 10.936 pu 8.936 pu 7.936 pu 9.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 1. 5. 10. un changed. 1. 5. 10. un changed. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton turbine is a ----------- turbine any of the above inward radial flow impulsive axial flow any of the above inward radial flow impulsive axial flow ANSWER DOWNLOAD EXAMIANS APP