Power Systems Zero sequence currents can flow from a line into a transformer bank if the windings are in ground star / delta. delta / delta. star / grounded star. delta / star. ground star / delta. delta / delta. star / grounded star. delta / star. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a AC transmission line None of these DC transmission line either 1 or 2 AC transmission line None of these DC transmission line either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factors does the selection of a water turbine depend Working head. Nature of load. All of above. Speed. Working head. Nature of load. All of above. Speed. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when any of the above phase angle become high reactive power goes beyond limit voltage at the bus become high any of the above phase angle become high reactive power goes beyond limit voltage at the bus become high ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 6114.05. 10000.32. 15515.22. 8113.27. 6114.05. 10000.32. 15515.22. 8113.27. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under over excitation synchronous phase modifier works as series capacitor any of the above shunt reactor shunt capacitor series capacitor any of the above shunt reactor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP