Power Systems Zero sequence currents can flow from a line into a transformer bank if the windings are in delta / delta. star / grounded star. delta / star. ground star / delta. delta / delta. star / grounded star. delta / star. ground star / delta. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The line is lightly loaded The power factor is unity The line is fully loaded The line is heavily loaded The line is lightly loaded The power factor is unity The line is fully loaded The line is heavily loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems Corona is accompanied by hissing sound violet visible light power loss and interference All of these hissing sound violet visible light power loss and interference All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power stations, economiser will reduce the thermal efficiency reduce the heat both 2 and 3 increase the thermal efficiency reduce the thermal efficiency reduce the heat both 2 and 3 increase the thermal efficiency ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? Due to corona, interference increases power loss increases All of these charging current increases interference increases power loss increases All of these charging current increases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of load bus are P and δ P and Q Q and V V and δ P and δ P and Q Q and V V and δ ANSWER DOWNLOAD EXAMIANS APP