Power Systems Deaerative heating is done to remove dissolved gases in water. remove dissolved. heat the steam. heat the feed water. remove dissolved gases in water. remove dissolved. heat the steam. heat the feed water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of inductance used for compensation of arcing grounds is 1/3ω²C 3/ω²C ω²C/3 3ω²C 1/3ω²C 3/ω²C ω²C/3 3ω²C ANSWER DOWNLOAD EXAMIANS APP
Power Systems A network containing 50 buses in which 10 are the voltage control buses, 6 are the generator buses. Find the size of the Jacobian matrix? 33*33 84*84 83*83 34*34 33*33 84*84 83*83 34*34 ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The line is lightly loaded The line is heavily loaded The power factor is unity The line is fully loaded The line is lightly loaded The line is heavily loaded The power factor is unity The line is fully loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.85 Hz -0.76 Hz -0.85 Hz 0.76 Hz 0.85 Hz -0.76 Hz -0.85 Hz 0.76 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems An hydro-graph indicates the discharge at any time during the period under consideration. the average run off during the period. All of these the maximum and minimum run off during the period. the discharge at any time during the period under consideration. the average run off during the period. All of these the maximum and minimum run off during the period. ANSWER DOWNLOAD EXAMIANS APP