Power Systems Highest pressure generating pump inside the thermal plant is All of these low pressure heater boiler feed pump high pressure heater All of these low pressure heater boiler feed pump high pressure heater ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of electrical power transmission is/are nether 1 nor 2 Transmission system must be more efficient with minimum line losses Voltage regulation of the transmission line must be zero or minimum both 1 and 2 nether 1 nor 2 Transmission system must be more efficient with minimum line losses Voltage regulation of the transmission line must be zero or minimum both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Turbine. Generator. Ash handling plant. Coal handling plant. Turbine. Generator. Ash handling plant. Coal handling plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The pu parameters for a 500 MVA machine on its own base are: Inertia, H = 20 pu; reactance X = 2 pu. The pu values of inertia and reactance on 100 MVA common base, respectively, are 100, 10 4, 10 4, 0.4 100, 0.4 100, 10 4, 10 4, 0.4 100, 0.4 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following materials is/are used as moderators? graphite All of these beryllium heavy water graphite All of these beryllium heavy water ANSWER DOWNLOAD EXAMIANS APP
Power Systems India’s largest thermal power station is located at Sarni. Neyveli. Kota. Chandrapur. Sarni. Neyveli. Kota. Chandrapur. ANSWER DOWNLOAD EXAMIANS APP