Power Systems Attenuation occurs due to both 1 and 3 inductance resistance conductance both 1 and 3 inductance resistance conductance ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 10.936 pu 9.936 pu 8.936 pu 7.936 pu 10.936 pu 9.936 pu 8.936 pu 7.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has self and mutual impedances are 0.8 and 0 pu respectively. Find the positive, negative and zero sequence impedances respectively? 0.8, 0.8 and 0.8 pu 0.6, 0.6 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.6, 0.8 and 1.2 pu 0.8, 0.8 and 0.8 pu 0.6, 0.6 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.6, 0.8 and 1.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following are the fertile materials U238 and Th239. U233 and Pu239. U238 and Th232. U238 and Pu239. U238 and Th239. U233 and Pu239. U238 and Th232. U238 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? In case of parallel transmission lines fault current reduces stability increases fault current increases both 1 and 3 fault current reduces stability increases fault current increases both 1 and 3 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Minimum load station. Base load station. None of above. Peak load station. Minimum load station. Base load station. None of above. Peak load station. ANSWER DOWNLOAD EXAMIANS APP