Power Systems Find the value of a729, where "a" is the operator α 1 α² 0 α 1 α² 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 10 sec. 20 sec. 5 sec. none of these. 10 sec. 20 sec. 5 sec. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The term self GMD is used to calculate resistance both 1 and 2 capacitance inductance resistance both 1 and 2 capacitance inductance ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of CB is in terms of voltage. current. volt - ampere. VAR. voltage. current. volt - ampere. VAR. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line has its conductors at the corners of an equilateral triangle with side 3m. The diameter of each conductor is 1.63 cm. The inductance of the line per phase per km is 1.043 mH 1.232 mH 1.093 mH 1.182 mH 1.043 mH 1.232 mH 1.093 mH 1.182 mH ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conductor carries more current on surface as compared to core. This is called as corona effect All of these skin effect unsymmetrical fault corona effect All of these skin effect unsymmetrical fault ANSWER DOWNLOAD EXAMIANS APP