Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 15.9 H 15.9 mH 2 mH 2 H 15.9 H 15.9 mH 2 mH 2 H ANSWER DOWNLOAD EXAMIANS APP
Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in improved voltage regulation reduction of KVA rating of distribution transformers reduction in distribution power loss All of these improved voltage regulation reduction of KVA rating of distribution transformers reduction in distribution power loss All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a pumped storage power plant is operated in conjunction with a steam power plant load factor of the steam plant is increased All of these the operating cost of the steam plant become optimum chances of the tripping of the system decrease load factor of the steam plant is increased All of these the operating cost of the steam plant become optimum chances of the tripping of the system decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed of water turbine is the speed at which the turbine develops maximum horse power. unit horse power at all heads. a minimum horse power. unit horse power at unit head. maximum horse power. unit horse power at all heads. a minimum horse power. unit horse power at unit head. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Per unit of any quantity is defined as base value of quantity /actual value of quantity in same units actual value of quantity /base value of quantity in same units base value of quantity /actual value of quantity in different units actual value of quantity /base value of quantity in different units base value of quantity /actual value of quantity in same units actual value of quantity /base value of quantity in same units base value of quantity /actual value of quantity in different units actual value of quantity /base value of quantity in different units ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. ANSWER DOWNLOAD EXAMIANS APP