Power Systems For variable heads of near about but less than 30 m, which type of turbines is used hydro power plant Pelton. Kaplan. Francis. None of above. Pelton. Kaplan. Francis. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following circuit breakers produce least arc energy? Minimum oil CB. Air blast CB. Air break CB. Plain oil CB. Minimum oil CB. Air blast CB. Air break CB. Plain oil CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are base load plants? nuclear plants thermal plants hydro plants All of these nuclear plants thermal plants hydro plants All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Cooling tower. Pulverising unit. Wind turbine. Condenser. Cooling tower. Pulverising unit. Wind turbine. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 120 MW, P2 = 80 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW P1 = 120 MW, P2 = 80 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of electrical power transmission is/are Transmission system must be more efficient with minimum line losses nether 1 nor 2 both 1 and 2 Voltage regulation of the transmission line must be zero or minimum Transmission system must be more efficient with minimum line losses nether 1 nor 2 both 1 and 2 Voltage regulation of the transmission line must be zero or minimum ANSWER DOWNLOAD EXAMIANS APP