Power Systems Uses of diesel power stations All of these peak load plant. standby plants. emergency plants. All of these peak load plant. standby plants. emergency plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a None of these DC transmission line AC transmission line either 1 or 2 None of these DC transmission line AC transmission line either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Graphite is use din nuclear plant as a / an moderator. coolant. electrode. fuel. moderator. coolant. electrode. fuel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands(N) is concentrically stranded cable with total annular space filled with strands of uniform diameter is given by (if x is number of layers) N = 3x²-2x+1 N = 3x²-3x+1 N = 3x²+3x+1 N = 3x²-6x+1 N = 3x²-2x+1 N = 3x²-3x+1 N = 3x²+3x+1 N = 3x²-6x+1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is any of the above less than the sending end voltage equal to the sending end voltage more than the sending end voltage any of the above less than the sending end voltage equal to the sending end voltage more than the sending end voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt capacitor at receiving end All of these shunt reactor at receiving end shunt resistance at receiving end shunt capacitor at receiving end All of these shunt reactor at receiving end shunt resistance at receiving end ANSWER DOWNLOAD EXAMIANS APP