Power Systems Uses of diesel power stations peak load plant. standby plants. emergency plants. All of these peak load plant. standby plants. emergency plants. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. Find the surge impedance loading with compensation? 386 MW 478 MW 456 MW 400 MW 386 MW 478 MW 456 MW 400 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following given faults, all the sequence currents are equal? LLL LL LG LLG LLL LL LG LLG ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main advantage of the Decoupled Load Flow (DLF) as compared to the NR method is All of these accuracy is more number of iterations are less reduced memory requirements in storing the Jacobian elements All of these accuracy is more number of iterations are less reduced memory requirements in storing the Jacobian elements ANSWER DOWNLOAD EXAMIANS APP
Power Systems For loss less line, find the ratio of length to the wave length of a signal for a phase shift of 0.05 radians? 7.95 × 10-3 2 × 10-3 7.95 × 10³ 8 × 10³ 7.95 × 10-3 2 × 10-3 7.95 × 10³ 8 × 10³ ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is compensated with shunt capacitance Csh. After shunt compensation surge impedance loading will None of these decreases increases remains unaffected None of these decreases increases remains unaffected ANSWER DOWNLOAD EXAMIANS APP