Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? shunt reactor series capacitor both 1 and 2 shunt capacitor shunt reactor series capacitor both 1 and 2 shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 20. 3. 7. 5. 20. 3. 7. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a 500 MVA, 11 kV 3-phase generator at 50 Hz feeds through a transfer impedance of (0+j0.605) Ω/phase, an infinite voltage also at 11 kV, then the maximum steady state power transfer on the base of 500 MVA and 11 kV is 0.8 pu 1 pu 0.5 pu 0.4 pu 0.8 pu 1 pu 0.5 pu 0.4 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Differential relays does not used for which of the following faults? faults within a generator through faults both 1 and 2 faults within a transformer faults within a generator through faults both 1 and 2 faults within a transformer ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 730 MW. 720 MW. 710 MW. 740 MW. 730 MW. 720 MW. 710 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission or reflection coefficient of voltage Tv? (Zl = Surge impedance of load, Zs = Surge impedance of line) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zs/(Zs + Zl) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zs/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP