Power Systems Range of accelerating factor is 1.6 to 1.8 10.8 to 11.2 1 to 10 50 to 100 1.6 to 1.8 10.8 to 11.2 1 to 10 50 to 100 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not base load power plant Pump storage. Nuclear. Diesel. Run water. Pump storage. Nuclear. Diesel. Run water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Direct conversion of heat energy into electrical energy is possible through Both A and C. MHD generator. Fuel or solar cell. Thermal converters. Both A and C. MHD generator. Fuel or solar cell. Thermal converters. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 20 - 25 mm. 300 mm. 200 - 205 mm. 40 mm. 20 - 25 mm. 300 mm. 200 - 205 mm. 40 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 100, 200 175, 125 150, 150 200, 100 100, 200 175, 125 150, 150 200, 100 ANSWER DOWNLOAD EXAMIANS APP