Power Systems

Power Systems
Range of accelerating factor is

 1 to 10
 10.8 to 11.2
 50 to 100
 1.6 to 1.8

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Surge impedance loading of a line is increased by which of the following compensation methods?

 series capacitor
 shunt capacitor
 both 1 and 2
 shunt reactor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at

 Farakka.
 Katwa.
 Bakreshwar.
 Durgapur.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A network containing 100 buses in which 10 are the voltage control buses, 5 are fixed shunt capacitor buses, 20 are the reactive power support buses, 6 are the generator buses. Find the size of the Jacobian matrix?

 165 × 165
 164 × 164
 162 × 162
 163 × 163

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following power plants needs highly skilled/qualified engineers for its operation

 Thermal.
 Hydro Power Plant
 Nuclear.
 Gas-turbine.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The main objectives of power system is/are

 Flexible power has to be available.
 Reliable power has to be available
 Cost of electrical energy per KWh is to be minimum
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑