Power Systems Range of accelerating factor is 1 to 10 10.8 to 11.2 50 to 100 1.6 to 1.8 1 to 10 10.8 to 11.2 50 to 100 1.6 to 1.8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? series capacitor shunt capacitor both 1 and 2 shunt reactor series capacitor shunt capacitor both 1 and 2 shunt reactor ANSWER DOWNLOAD EXAMIANS APP
Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Farakka. Katwa. Bakreshwar. Durgapur. Farakka. Katwa. Bakreshwar. Durgapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A network containing 100 buses in which 10 are the voltage control buses, 5 are fixed shunt capacitor buses, 20 are the reactive power support buses, 6 are the generator buses. Find the size of the Jacobian matrix? 165 × 165 164 × 164 162 × 162 163 × 163 165 × 165 164 × 164 162 × 162 163 × 163 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Thermal. Hydro Power Plant Nuclear. Gas-turbine. Thermal. Hydro Power Plant Nuclear. Gas-turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of power system is/are Flexible power has to be available. Reliable power has to be available Cost of electrical energy per KWh is to be minimum All of these Flexible power has to be available. Reliable power has to be available Cost of electrical energy per KWh is to be minimum All of these ANSWER DOWNLOAD EXAMIANS APP