Power Systems In hydroelectric power plants both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW P1 = 120 MW, P2 = 80 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW P1 = 120 MW, P2 = 80 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where the voltage is high and current to be interrupted is low, Which of following the breaker is preferable? Oil CB. Any of these. Air blast CB. Vacuum CB. Oil CB. Any of these. Air blast CB. Vacuum CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the breakdown voltage of the insulator is high, the thickness of the insulator is None of these less it does not related to breakdown voltage high None of these less it does not related to breakdown voltage high ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines None of these. Francis turbine and Kaplan turbine. Kaplan and Pelton turbine. Pelton turbine and Francis turbine. None of these. Francis turbine and Kaplan turbine. Kaplan and Pelton turbine. Pelton turbine and Francis turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following grounding is not practically preferred for protection of equipments? reactance grounding isolated grounding All of these resistance grounding reactance grounding isolated grounding All of these resistance grounding ANSWER DOWNLOAD EXAMIANS APP