Power Systems In hydroelectric power plants both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission line positive sequence reactance Xs - Xm Xm - Xs 2Xs + Xm Xs +2 Xm Xs - Xm Xm - Xs 2Xs + Xm Xs +2 Xm ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 72 MW 720 MW 50 MW 30 MW 72 MW 720 MW 50 MW 30 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of per unit system is/are Need of transformation ratio All of these No units for any quantity It has units for all quantities Need of transformation ratio All of these No units for any quantity It has units for all quantities ANSWER DOWNLOAD EXAMIANS APP
Power Systems Example of base load stations are hydro. thermal. gas turbine. both A and B. hydro. thermal. gas turbine. both A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CT is connected in ___________________ with the line. across. series. not connected. both A and B. across. series. not connected. both A and B. ANSWER DOWNLOAD EXAMIANS APP