Power Systems Rankine cycle efficiency of a steam power plant is of 45 - 80 %. 60 - 80 %. 30 - 45 %. 20 - 30 %. 45 - 80 %. 60 - 80 %. 30 - 45 %. 20 - 30 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 0.75. 1.05. 0.90. 1.20. 0.75. 1.05. 0.90. 1.20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is an impulse turbine Kaplan turbine. None of above. Pelton turbine. Francis turbine. Kaplan turbine. None of above. Pelton turbine. Francis turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has a diameter of 2 cm has internal inductance of 0.05 mH/Km. If this ACSR is replaced with another having a diameter of 4 cm then its internal inductance is 0.05 mH/Km 0.025 mH/Km 0 mH/Km 0.1 mH/Km 0.05 mH/Km 0.025 mH/Km 0 mH/Km 0.1 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power and the transmission line is compensated with a series capacitance of 0.5 Pu. Find the load angle with series capacitance compensation ? 14.5° 29° 35.5° 10.5° 14.5° 29° 35.5° 10.5° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton wheel turbine is a high head turbine. medium head turbine. low head turbine. none of above. high head turbine. medium head turbine. low head turbine. none of above. ANSWER DOWNLOAD EXAMIANS APP