Power Systems

Power Systems
Rankine cycle efficiency of a steam power plant is of

  45 - 80 %.
  60 - 80 %.
  30 - 45 %.
  20 - 30 %.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

 Gas turbine plant.
 Thermal power plant.
 Nuclear power plant.
  Hydro electric power plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
One Kg of natural uranium gives energy equivalent to about

 100 Kg of coal.
  10500 Kg of coal.
 5000 Kg of coal.
 1000 Kg of coal.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
String chart is drawn between

 T on Y-axis and S and T on on X-axis
 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis
 nether 1 nor 2
 both 1 and 2

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The pu parameters for a 500 MVA machine on its own base are: Inertia, H = 20 pu; reactance X = 2 pu. The pu values of inertia and reactance on 100 MVA common base, respectively, are

 100, 10
 4, 0.4
 100, 0.4
 4, 10

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The specific speeds of Kaplan, Francis and Pelton turbines are in

 the increasing order.
  the decreasing order.
None of these
 neither increasing nor decreasing order.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑