Power Systems Rankine cycle efficiency of a steam power plant is of 30 - 45 %. 60 - 80 %. 20 - 30 %. 45 - 80 %. 30 - 45 %. 60 - 80 %. 20 - 30 %. 45 - 80 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear power plant are used as none of above. peak load plants. intermediate load plants. base load plants. none of above. peak load plants. intermediate load plants. base load plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. None of above 56 %. 14 %. 28 %. None of above 56 %. 14 %. 28 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 KV network, 360 KV is recorded at a 400 KV bus. The reactive power absorbed by shunt rated for 50 MVAr, 400 KV connected at the bus is 61.73 MVAr. 45 MVAr. 55.56 MVAr. 40.5 MVAr. 61.73 MVAr. 45 MVAr. 55.56 MVAr. 40.5 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Zero sequence currents can flow from a line into a transformer bank if the windings are in ground star / delta. star / grounded star. delta / delta. delta / star. ground star / delta. star / grounded star. delta / delta. delta / star. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. ANSWER DOWNLOAD EXAMIANS APP