Power Systems Which of the following is/are base load plants? thermal plants nuclear plants hydro plants All of these thermal plants nuclear plants hydro plants All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following frequency control method tie line may be overloaded? parallel frequency flat frequency control flat tie line control All of these parallel frequency flat frequency control flat tie line control All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Skin effective is more in case of communication lines None of these power lines same in both cases communication lines None of these power lines same in both cases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Peak load power plants is/are diesel plant pumped storage plant both 1 and 2 nuclear plants diesel plant pumped storage plant both 1 and 2 nuclear plants ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage and current instantaneous values are given as 5 sin (ωt + 30°) pu and 2 sin (ωt - 15°) pu respectively. Find the per unit active power? 5.353 pu 3.535 pu 5 pu 7 pu 5.353 pu 3.535 pu 5 pu 7 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The characteristic impedance of a transmission line is Directly proportional to square root of its length. Independent of its length. Inversely proportional to square root of its length. Directly proportional to its length. Directly proportional to square root of its length. Independent of its length. Inversely proportional to square root of its length. Directly proportional to its length. ANSWER DOWNLOAD EXAMIANS APP