Power Systems The specific speeds of Kaplan, Francis and Pelton turbines are in the decreasing order. None of these neither increasing nor decreasing order. the increasing order. the decreasing order. None of these neither increasing nor decreasing order. the increasing order. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of re-striking voltage is dependent upon inductance of the system only both 1 and 2 resistance of the system only capacitance of the system only inductance of the system only both 1 and 2 resistance of the system only capacitance of the system only ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10-6∠90° â„§. Find the no load receiving end voltage? 500 kV 400 kV 600 kV 320 kv 500 kV 400 kV 600 kV 320 kv ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 53 MW. 52 MW. 51.61 MW. 57.5 MW. 53 MW. 52 MW. 51.61 MW. 57.5 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 3 layer transmission line? 29 19 1 7 29 19 1 7 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Alternate formation and breakage of bubbles are called surgfication. All of these cavitations. water hamming. surgfication. All of these cavitations. water hamming. ANSWER DOWNLOAD EXAMIANS APP