Power Systems At slack bus, which one of the following combinations of variables is not specified? Q and V V and δ P and V P and Q Q and V V and δ P and V P and Q ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Stock bridge dampers are used to reduce the tension reduce the vibrations at the point of support All of these increase the sag reduce the tension reduce the vibrations at the point of support All of these increase the sag ANSWER DOWNLOAD EXAMIANS APP
Power Systems Demand factor of a plant is less than 1 0 1 greater than 1 less than 1 0 1 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 0.75. 1.0. 0.99. 1.35. 0.75. 1.0. 0.99. 1.35. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Length of short transmission line is up to 80 km 40 km 150 km any of the above 80 km 40 km 150 km any of the above ANSWER DOWNLOAD EXAMIANS APP