Power Systems In load flow studies PV bus is treated as PQ bus when phase angle become high reactive power goes beyond limit any of the above voltage at the bus become high phase angle become high reactive power goes beyond limit any of the above voltage at the bus become high ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line has a length of 600 km, find the phase shift of voltage signal? 42° 45° 36° 90° 42° 45° 36° 90° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from both B and C. flow duration curve. mass Curve. hydro-graph. both B and C. flow duration curve. mass Curve. hydro-graph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Galvanised steel is generally used as structural components. stray wire. All of these earth wire. structural components. stray wire. All of these earth wire. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1- phase transmission line operating at 30 kV has radius of 1 cm and distance between conductors is 0.5 m. Assume m = δ =1, g = 21 kV/cm and frequency f = 50 Hz. Find the critical disruptive voltage? 34.64 kV/phase 82.15 kV/phase 17.32 kV/phase 41.075 kV/phase 34.64 kV/phase 82.15 kV/phase 17.32 kV/phase 41.075 kV/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems String chart is drawn between T on Y-axis and S and T on on X-axis nether 1 nor 2 both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis T on Y-axis and S and T on on X-axis nether 1 nor 2 both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis ANSWER DOWNLOAD EXAMIANS APP