Power Systems Hydro-graph is similar to mass curve. both B and C. energy load curve. load curve. mass curve. both B and C. energy load curve. load curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Lagrange multiplier Blocking factor Gauss constant Acceleration factor Lagrange multiplier Blocking factor Gauss constant Acceleration factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 5. 7. 3. 20. 5. 7. 3. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine load factory at the plant. total power available at the site. total units of energy available. diversity factor for the plant. load factory at the plant. total power available at the site. total units of energy available. diversity factor for the plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear power plant are used as intermediate load plants. peak load plants. none of above. base load plants. intermediate load plants. peak load plants. none of above. base load plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? -0.85 Hz 0.76 Hz 0.85 Hz -0.76 Hz -0.85 Hz 0.76 Hz 0.85 Hz -0.76 Hz ANSWER DOWNLOAD EXAMIANS APP