Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° ℧. Find Charging current under no load? 0.144∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.512∠90° A/phase 0.144∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.512∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for maximum capacity breaker. minimum capacity breaker. miniature circuit breaker. molded circuit breaker. maximum capacity breaker. minimum capacity breaker. miniature circuit breaker. molded circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 15 MW 80 MW 20 MW 10 MW 15 MW 80 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two identical synchronous machines having same inertia constant are connected in parallel and swinging together. The effective inertia constant is 4 MJ/MVA. Then each machine has inertia constant of 4 MJ/MVA 8 MJ/MVA 16 MJ/MVA 2 MJ/MVA 4 MJ/MVA 8 MJ/MVA 16 MJ/MVA 2 MJ/MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the transmitted voltage? 30.6 Kv 36. 36 kV 100 kV 18.18 kV 30.6 Kv 36. 36 kV 100 kV 18.18 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Boiler. Steam turbine. Super heater. Condenser. Boiler. Steam turbine. Super heater. Condenser. ANSWER DOWNLOAD EXAMIANS APP