Power Systems

Power Systems
Which of the following is not base load power plant

  Diesel.
  Nuclear.
  Pump storage.
  Run water.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is an impulse turbine

  Francis turbine.
  None of above.
  Pelton turbine.
  Kaplan turbine.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is

 1500 MW
 1000 MW
 750 MW
 1250 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Length of short transmission line is up to

 80 km
 any of the above
 40 km
 150 km

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Oxide film arrestor has which of the following properties?

 It is expensive.
 Both A and B.
 Does not require daily charging.
 Installed at points of transmission line where daily visit is difficult.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A power system network has n nodes, Z33 of its bus impedance matrix is j0.5 pu. The voltage at node 3 is 1.3∠ -10°. If capacitor is having reactance of -j3.5 pu is now added to the network between node 3 and reference node, the current drawn by the capacitor in pu is

 0.371∠ -100°
 0.325∠ -100°
 0.725∠ 80°
 0.433∠ 80°

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑