Power Systems Out of the following plant categories which is not the base load power plant? Diesel. Run of river. Nuclear. Pump storage. Diesel. Run of river. Nuclear. Pump storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with 5th harmonic current. 2nd harmonic current. 7th harmonic current. 3rd harmonic current. 5th harmonic current. 2nd harmonic current. 7th harmonic current. 3rd harmonic current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 10 MVA generator has reactance of 0.2 pu. Find the new reactance value for 50 MVA base? 5 pu 1 pu 0.2 pu 0.25 pu 5 pu 1 pu 0.2 pu 0.25 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems At slack bus, which one of the following combinations of variables is not specified? V and δ Q and V P and V P and Q V and δ Q and V P and V P and Q ANSWER DOWNLOAD EXAMIANS APP
Power Systems Breaking current is a ------------------ value? RMS average any of the above maximum RMS average any of the above maximum ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the conductor diameter decreases, inductance of the line, None of these increases remains unaffected decreases None of these increases remains unaffected decreases ANSWER DOWNLOAD EXAMIANS APP