Power Systems
A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be

  720 MW.
 730 MW.
 740 MW.
 710 MW.