Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 730 MW. 720 MW. 710 MW. 740 MW. 730 MW. 720 MW. 710 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Alternate formation and breakage of bubbles are called surgfication. All of these cavitations. water hamming. surgfication. All of these cavitations. water hamming. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 0.99. 1.0. 1.35. 0.75. 0.99. 1.0. 1.35. 0.75. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Pulverising unit. Wind turbine. Condenser. Cooling tower. Pulverising unit. Wind turbine. Condenser. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Bundled conductors are used for EHV transmission lines primarily for reducing the surge impedance of the line copper loss corona loss voltage drop across the line surge impedance of the line copper loss corona loss voltage drop across the line ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 10 sec. 5 sec. none of these. 20 sec. 10 sec. 5 sec. none of these. 20 sec. ANSWER DOWNLOAD EXAMIANS APP