Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 740 MW. 730 MW. 710 MW. 720 MW. 740 MW. 730 MW. 710 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 200 km operating at frequency of 10 Hz Hz. Find the type of the line medium transmission line short transmission line any of the above long transmission line medium transmission line short transmission line any of the above long transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems What type of back up protection is used for alternators? Buchholz relay. IDMT relay. Mho relay. Impedance relay. Buchholz relay. IDMT relay. Mho relay. Impedance relay. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems For loss less line, find the ratio of length to the wave length of a signal for a phase shift of 0.05 radians? 7.95 × 10³ 2 × 10-3 8 × 10³ 7.95 × 10-3 7.95 × 10³ 2 × 10-3 8 × 10³ 7.95 × 10-3 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plants, pressure in the working fluid cycle is developed by condenser. superheater. turbine. feed water pump. condenser. superheater. turbine. feed water pump. ANSWER DOWNLOAD EXAMIANS APP