Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 740 MW. 730 MW. 720 MW. 710 MW. 740 MW. 730 MW. 720 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Based on the discharge, Kaplan turbine will discharge 1000 lpm >10000 lpm 1000 lpm >10000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relays is/are unit protection relays? both 1 and 2 Differential relays Buccholz relays over current relays both 1 and 2 Differential relays Buccholz relays over current relays ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 2725 MW. 1835 MW. 3257 MW. 2280 MW. 2725 MW. 1835 MW. 3257 MW. 2280 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a neutral point of 3 - Φ system is directly connected to earth then it has what type of grounding? Resistance. Reactance. Solid. Peterson coil. Resistance. Reactance. Solid. Peterson coil. ANSWER DOWNLOAD EXAMIANS APP