Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 720 MW. 740 MW. 730 MW. 710 MW. 720 MW. 740 MW. 730 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 60 Hz, 320 Km loss less line has sending end voltage 1.0 pu. The receiving end voltage on no-load is none of these. 1.088 pu. 1.1 pu. 1.116 pu. none of these. 1.088 pu. 1.1 pu. 1.116 pu. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In coal fired thermal power stations, what are the electrostatic precipitators used for? All of these To keep the air heaters clean To collect the dust particles from the flue gases To remove dust particles setting on the bus bar conductors in the station switch yard All of these To keep the air heaters clean To collect the dust particles from the flue gases To remove dust particles setting on the bus bar conductors in the station switch yard ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of moderator in a nuclear reactor is to increase the energy of the neutrons. All of these to slow down the neutrons. to absorb the excess. to increase the energy of the neutrons. All of these to slow down the neutrons. to absorb the excess. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 18 MW 5 MW 9 MW 10 MW 18 MW 5 MW 9 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Radio interference occur in telecommunication line due to electro static induction electro magnetic induction nether 1 nor 2 both 1 and 2 electro static induction electro magnetic induction nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP