Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 710 MW. 730 MW. 740 MW. 720 MW. 710 MW. 730 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating cost of thermal power station is is the same as that of nuclear power plant. less than that of hydroelectric power plant. less than that of diesel power plant. less than that of nuclear power plant. is the same as that of nuclear power plant. less than that of hydroelectric power plant. less than that of diesel power plant. less than that of nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 20. 5. 3. 7. 20. 5. 3. 7. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal protection relay provides protection against what? Over load any of the above Temperature Short circuit Over load any of the above Temperature Short circuit ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when voltage at the bus become high any of the above phase angle become high reactive power goes beyond limit voltage at the bus become high any of the above phase angle become high reactive power goes beyond limit ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the conductor diameter decreases, inductance of the line, None of these increases decreases remains unaffected None of these increases decreases remains unaffected ANSWER DOWNLOAD EXAMIANS APP