Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 730 MW. 740 MW. 720 MW. 710 MW. 730 MW. 740 MW. 720 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants normally operage at high speeds Hydro electric. Thermal. Petrol engine. Diesel engine. Hydro electric. Thermal. Petrol engine. Diesel engine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Inductance of transmission line will decrease when both GMD and GMR decrease GMD increase and GMR decrease GMD decrease and GMR increase both GMD and GMR increase both GMD and GMR decrease GMD increase and GMR decrease GMD decrease and GMR increase both GMD and GMR increase ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inductance of single phase two wire line is given by 0.4×10-7× ln(d/r') H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 4×10-7× ln(r'/d) H/m 0.4×10-7× ln(d/r') H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 4×10-7× ln(r'/d) H/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the desirable properties of a insulator material? High ratio of puncture strength to flash over. High relative permittivity Low ratio of puncture strength to flash over. Both 1 and 2 High ratio of puncture strength to flash over. High relative permittivity Low ratio of puncture strength to flash over. Both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm sinωt? 9.68 msec 1.47 msec 4.68 msec 2.63 msec 9.68 msec 1.47 msec 4.68 msec 2.63 msec ANSWER DOWNLOAD EXAMIANS APP