Power Systems Mechanical energy is supplied to a DC generator at the rate of 4200 J / S. The generator delivers 32.2 Amp at 120 V. How much energy is cost per minute of operation 25060 J. 20060 J. 20160 J. 23060 J. 25060 J. 20060 J. 20160 J. 23060 J. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Over current relay Buchholz relay Over fluxing relay Differential relay Over current relay Buchholz relay Over fluxing relay Differential relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission or reflection coefficient of voltage Tv? (Zl = Surge impedance of load, Zs = Surge impedance of line) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zl - Zs)/(Zs + Zl) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zl - Zs)/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a 500 MVA, 11 kV 3-phase generator at 50 Hz feeds through a transfer impedance of (0+j0.605) Ω/phase, an infinite voltage also at 11 kV, then the maximum steady state power transfer on the base of 500 MVA and 11 kV is 0.4 pu 1 pu 0.8 pu 0.5 pu 0.4 pu 1 pu 0.8 pu 0.5 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earth fault relay uses the which of the following sequence currents? negative sequence any of the above zero sequence positive sequence negative sequence any of the above zero sequence positive sequence ANSWER DOWNLOAD EXAMIANS APP
Power Systems An impulse turbine operates by initial complete conversion to kinetic energy. makes use of a draft tube. is most suited for low head and high discharge power plants. always operates submerged. operates by initial complete conversion to kinetic energy. makes use of a draft tube. is most suited for low head and high discharge power plants. always operates submerged. ANSWER DOWNLOAD EXAMIANS APP