Power Systems Pumped storage plant is a None of these peak load plant base load plant both 1 and 2 None of these peak load plant base load plant both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A three phase, 33 kV oil circuit breaker is rated 1200 A, the symmetrical breaking capacity is 2000 MVA, 3 secs. Then the making capacity is 5100 MVA. 5200 MVA. 5500 MVA. 5000 MVA. 5100 MVA. 5200 MVA. 5500 MVA. 5000 MVA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 105.2 95.5 102.5 85.5 105.2 95.5 102.5 85.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the breakdown voltage of the insulator is high, the thickness of the insulator is less it does not related to breakdown voltage high None of these less it does not related to breakdown voltage high None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Pumped storage. Nuclear power station. Power station. Thermal power station. Pumped storage. Nuclear power station. Power station. Thermal power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 5. un changed. 10. 1. 5. un changed. 10. 1. ANSWER DOWNLOAD EXAMIANS APP