Power Systems Pumped storage plant is a peak load plant base load plant None of these both 1 and 2 peak load plant base load plant None of these both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively? 0.65 and 0.55 0.55 and 0.733 0.733 and 0.55 0.733 and 0.65 0.65 and 0.55 0.55 and 0.733 0.733 and 0.55 0.733 and 0.65 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has internal inductance 0.05 mH/Km for µr = 1. If this ACSR is replaced with another having µr = 2, then find the internal inductance? 0 mH/Km 0.05 mH/Km 0.1 mH/Km 0.025 mH/Km 0 mH/Km 0.05 mH/Km 0.1 mH/Km 0.025 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 300 kW 500 kW 250 kW 750 kW 300 kW 500 kW 250 kW 750 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as turbine efficiency. efficiency of thermal cycle. product of efficiencies of all stages. generator efficiency. turbine efficiency. efficiency of thermal cycle. product of efficiencies of all stages. generator efficiency. ANSWER DOWNLOAD EXAMIANS APP