Pumped storage plant is a

 base load plant
 both 1 and 2
 peak load plant
None of these

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

 Nuclear power plant.
  Hydro electric power plant.
 Gas turbine plant.
 Thermal power plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An isolated synchronous generator with transient reactance equal to 0.1 pu on a 100 MVA base is connected to the high voltage bus through a step up transformer of reactance 0.1 pu on a 100 MVA base. The fault level at the bus is

 400 MVA
 100 MVA
 200 MVA
 500 MVA

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system?

 1.476 A.
 1 A.
 14.7 mA.
  14.76 A.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Proximity effect is more in case of

 same in both cases
 power cables
None of these
 over head lines

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If a fault occurs on any feeder, the fault current is

  much lower than with unsectional bus bar.
  much higher than with unsectional bus bar.
  none of these.
  equal to unsectional bus bar.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑