Power Systems Pumped storage plant is a both 1 and 2 base load plant peak load plant None of these both 1 and 2 base load plant peak load plant None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 5 × 106 kWh. 2.044 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. 2.044 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For accurate load flow calculations on large power systems, the best method is N-R method G-S method All of these Decoupled method N-R method G-S method All of these Decoupled method ANSWER DOWNLOAD EXAMIANS APP
Power Systems Stability of a transmission line can be increased by series capacitor shunt reactor shunt capacitor both 1 and 2 series capacitor shunt reactor shunt capacitor both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm sinωt? 2.63 msec 4.68 msec 9.68 msec 1.47 msec 2.63 msec 4.68 msec 9.68 msec 1.47 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 7. 5. 20. 3. 7. 5. 20. 3. ANSWER DOWNLOAD EXAMIANS APP