Pumped storage plant is a

 peak load plant
 both 1 and 2
None of these
 base load plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load current in short circuit calculations are neglected because

 both 1 and 2
 short circuit currents are greatly out of phase with load currents
 nether 1 nor 2
 short circuit currents are much larger than load currents

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The steam power plant efficiency can be improved by

 using large quantity of water.
  using high temperature and high pressure steam.
 decreasing the load on the plant.
 burning large amount of coal.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Mho relay is used for the protection of

 short length lines.
 no length criterion.
 medium length lines.
  long transmission lines.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor?

 25%
 50.5%
 75%
 62.5%

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Three generators rated 100 MVA, 11 kV have an impedance of 0.15 pu each. If in the same plant, these generators are being replaced by a single equivalent generator, the effective impedance of equivalent generator will be

 0.05 pu
 0.45 pu
 0.25 pu
 0.15 pu

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑