Power Systems Plant capacity factor value is less than 1 0 1 greater than 1 less than 1 0 1 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LG. LLLG. LL. LLG. LG. LLLG. LL. LLG. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 50 km operating at frequency of 500 Hz. Find the type of the line? long transmission line medium transmission line any of the above short transmission line long transmission line medium transmission line any of the above short transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3.5 × 106 kV / sec. 1 × 106 kV / sec. 3 × 106 kV / sec. 2 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 3 × 106 kV / sec. 2 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inductance of single phase two wire line is given by 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 0.4×10-7× ln(d/r') H/m 4×10-7× ln(r'/d) H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 0.4×10-7× ln(d/r') H/m 4×10-7× ln(r'/d) H/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems Electrostatic precipitators in thermal power plants are used for All of these control flow rate remove moisture from the cole removal of ash from flue gas All of these control flow rate remove moisture from the cole removal of ash from flue gas ANSWER DOWNLOAD EXAMIANS APP