Power Systems Gas turbine power plants for maximum efficient may have Reheating. Multistage compression. All of above. Heat exchangers. Reheating. Multistage compression. All of above. Heat exchangers. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 5 6 8 2 5 6 8 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° ℧. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 600 kV 350 kV 500 kV 400 kV 600 kV 350 kV 500 kV 400 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Galvanised steel is generally used as All of these structural components. stray wire. earth wire. All of these structural components. stray wire. earth wire. ANSWER DOWNLOAD EXAMIANS APP