Power Systems Deflectors are provided in Kaplan turbine. Pelton wheel. Francis turbine. propeller turbine. Kaplan turbine. Pelton wheel. Francis turbine. propeller turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Draw - in - system / duct - pipe laying. Both A and B. None of these. Direct laying. Draw - in - system / duct - pipe laying. Both A and B. None of these. Direct laying. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect will not occur in which of the following transmission lines long transmission lines medium transmission lines All of these short transmission lines long transmission lines medium transmission lines All of these short transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Area under the daily curve divided by 24 gives maximum load units generated maximum demand average load maximum load units generated maximum demand average load ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is pumped storage plant thermal plant hydro power plant nuclear plant pumped storage plant thermal plant hydro power plant nuclear plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 0.90. 1.20. 0.75. 1.05. 0.90. 1.20. 0.75. 1.05. ANSWER DOWNLOAD EXAMIANS APP