Power Systems Units of incremental cost is RsMW/hr Rs/hr MWhr/Rs Rs/MWhr RsMW/hr Rs/hr MWhr/Rs Rs/MWhr ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel None of above. U233. Pu239. U235. None of above. U233. Pu239. U235. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass is maximum mass of fissionable material required to sustain a chain reaction. none of these. a mass of fissionable material required to stop a chain reaction. minimum mass of fissionable material required to sustain chain reaction. maximum mass of fissionable material required to sustain a chain reaction. none of these. a mass of fissionable material required to stop a chain reaction. minimum mass of fissionable material required to sustain chain reaction. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 25 to 35 kV any voltage above 33 kV 31.35 to 34.65 kV 33 to 50 kV 25 to 35 kV any voltage above 33 kV 31.35 to 34.65 kV 33 to 50 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton wheel turbine is a medium head turbine. high head turbine. none of above. low head turbine. medium head turbine. high head turbine. none of above. low head turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earthing switch is used for measuring of safety voltage All of these protection of equipment from ground faults discharging residual energies measuring of safety voltage All of these protection of equipment from ground faults discharging residual energies ANSWER DOWNLOAD EXAMIANS APP