Power Systems Which of the following methods is/are used for reactive or voltage compensation generation excitation control All of these shunt capacitor series capacitor generation excitation control All of these shunt capacitor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems An hydro-graph indicates the maximum and minimum run off during the period. the discharge at any time during the period under consideration. the average run off during the period. All of these the maximum and minimum run off during the period. the discharge at any time during the period under consideration. the average run off during the period. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by either 1 or 2 increasing voltage level nether 1 nor 2 decreasing reactance value either 1 or 2 increasing voltage level nether 1 nor 2 decreasing reactance value ANSWER DOWNLOAD EXAMIANS APP
Power Systems A gas turbine power plant is best suited for None of these. Peak load. Base load. Emergency. None of these. Peak load. Base load. Emergency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz. The number of poles required in the alternator is 4 10 8 20 4 10 8 20 ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the ratio of the C.T. on the H.V side of a 3 - φ star / delta 33 / 11 kV transformer if the protecting CT on the LV side has a ratio of 300 : 5 ? 200 : 5 / √3. 100 : 5 / √3. 150 : 4 / √3. 120 : 6 / √3. 200 : 5 / √3. 100 : 5 / √3. 150 : 4 / √3. 120 : 6 / √3. ANSWER DOWNLOAD EXAMIANS APP