Power Systems An hydro-graph indicates the discharge at any time during the period under consideration. the average run off during the period. the maximum and minimum run off during the period. All of these the discharge at any time during the period under consideration. the average run off during the period. the maximum and minimum run off during the period. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In case of failure of prime mover of the generator, which type of relay is used? offset mho relay impedance relay distance relays reverse power relay offset mho relay impedance relay distance relays reverse power relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Nuclear. Thermal. Hydro Power Plant Gas turbine. Nuclear. Thermal. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station plant load factor is defined as the ratio of average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated minimum load to peak load average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated minimum load to peak load ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has a rating of 10 MVA, 5 kV has a reactance of 0.02 pu. Find the reactance at a new base values of 50 MVA, 10 kV? 0.05 0.025 0.25 0.02 0.05 0.025 0.25 0.02 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transmission line is most practically used in load flow analysis? nether 1 nor 2 either 1 or 2 Nominal ∏ Nominal T nether 1 nor 2 either 1 or 2 Nominal ∏ Nominal T ANSWER DOWNLOAD EXAMIANS APP