Power Systems An hydro-graph indicates the maximum and minimum run off during the period. All of these the average run off during the period. the discharge at any time during the period under consideration. the maximum and minimum run off during the period. All of these the average run off during the period. the discharge at any time during the period under consideration. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer in a transmission line can be obtained by None of these increasing voltage level either 1 or 2 reducing reactance None of these increasing voltage level either 1 or 2 reducing reactance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of pumped storage plants is/are All of these used as load frequency control most economical as a peak load supply plant operating time is minimum All of these used as load frequency control most economical as a peak load supply plant operating time is minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems For accurate load flow calculations on large power systems, the best method is Decoupled method G-S method All of these N-R method Decoupled method G-S method All of these N-R method ANSWER DOWNLOAD EXAMIANS APP
Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine total units of energy available. diversity factor for the plant. total power available at the site. load factory at the plant. total units of energy available. diversity factor for the plant. total power available at the site. load factory at the plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Vacuum CB. Oil CB. Air blast CB. SF6 CB. Vacuum CB. Oil CB. Air blast CB. SF6 CB. ANSWER DOWNLOAD EXAMIANS APP