Power Systems

Power Systems
Specified quantities of load bus are

 P and Q
 Q and V
 P and δ
 V and δ

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following statements is/are true? By increasing of temperature,

 sag increase
 neither 1 nor 2
 both 1 and 2
 tension decrease

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is

 250 kW
 750 kW
 300 kW
 500 kW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Reflector of a nuclear reactor are made up of

 steel.
  boron.
 cast iron.
  beryllium.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Maximum power transfer capability of transmission line can be increased by

All of these
 Parallel transmission lines
 Using series capacitance
 Using bundled conductors

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following plants has the maximum eapital cost

 Steam plants.
 Diesel plants.
 Hydro-plants.
  Nuclear plants.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑