Power Systems Efficiency of thermal power plant can be taken as product of efficiencies of all stages. generator efficiency. efficiency of thermal cycle. turbine efficiency. product of efficiencies of all stages. generator efficiency. efficiency of thermal cycle. turbine efficiency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Peak load station. None of above. Minimum load station. Base load station. Peak load station. None of above. Minimum load station. Base load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Counter poise is used for more surge impedance proper discharging of lighting surges less surge impedance reduce losses more surge impedance proper discharging of lighting surges less surge impedance reduce losses ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as any of the above shunt capacitor shunt reactor series capacitor any of the above shunt capacitor shunt reactor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 51.61 MW. 52 MW. 53 MW. 57.5 MW. 51.61 MW. 52 MW. 53 MW. 57.5 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a transmission line can be increased by addition of lumped capacitance in series addition of lumped inductance in parallel increasing its voltage level both 1 and 3 addition of lumped capacitance in series addition of lumped inductance in parallel increasing its voltage level both 1 and 3 ANSWER DOWNLOAD EXAMIANS APP