Power Systems Which of the following represents the transmission line positive sequence reactance Xs - Xm 2Xs + Xm Xm - Xs Xs +2 Xm Xs - Xm 2Xs + Xm Xm - Xs Xs +2 Xm ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.83. 0.44. 1.3. 0.25. 0.83. 0.44. 1.3. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of following fuels is used by slow thermal nuclear reaction for power generation U238. U235. Th232. Pu239. U238. U235. Th232. Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gas turbine power plants for maximum efficient may have Heat exchangers. Reheating. Multistage compression. All of above. Heat exchangers. Reheating. Multistage compression. All of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The advantage of hydro electric power station over thermal power station is the initial cost of hydro electric power station is low hydro electric power station can supply the power throughout the year hydro electric station can be constructed at the place where the energy is required the operation cost of hydro electric power station is low the initial cost of hydro electric power station is low hydro electric power station can supply the power throughout the year hydro electric station can be constructed at the place where the energy is required the operation cost of hydro electric power station is low ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is low high can't say very high low high can't say very high ANSWER DOWNLOAD EXAMIANS APP