Power Systems Pipes carrying steam are generally of steel. cast iron. aluminium. cobalt. steel. cast iron. aluminium. cobalt. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Over current relay Differential relay Buchholz relay Over fluxing relay Over current relay Differential relay Buchholz relay Over fluxing relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.25. 1.3. 0.83. 0.44. 0.25. 1.3. 0.83. 0.44. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Half life is defined as the time required to spiliting of a heavy nucleus. none of above. the time required for one half of isotope to decay. the time required for full of atoms in a specimen disintegrate. the time required to spiliting of a heavy nucleus. none of above. the time required for one half of isotope to decay. the time required for full of atoms in a specimen disintegrate. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as generator efficiency. efficiency of thermal cycle. turbine efficiency. product of efficiencies of all stages. generator efficiency. efficiency of thermal cycle. turbine efficiency. product of efficiencies of all stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the diameter of the conductor is increased the resistance is increased the inductance is decreased no change in inductance and resistance the inductance is increased the resistance is increased the inductance is decreased no change in inductance and resistance the inductance is increased ANSWER DOWNLOAD EXAMIANS APP