Power Systems Pipes carrying steam are generally of cast iron. aluminium. steel. cobalt. cast iron. aluminium. steel. cobalt. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In what from the initial energy will be released for the 200 MeV per fission by a neutron in a slow thermal nuclear reactor heat energy. electromagnetic radiations. kinetic energy of particles and electromagnetic radiation. kinetic energy and sound energy. heat energy. electromagnetic radiations. kinetic energy of particles and electromagnetic radiation. kinetic energy and sound energy. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 250 MW 1250 MW 750 MW 500 MW 250 MW 1250 MW 750 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The internal flux linkage due to internal flux of a conductor is I/4*10-7 wb-T/m All of these I/6*10-7 wb-T/m I/2*10-7 wb-T/m I/4*10-7 wb-T/m All of these I/6*10-7 wb-T/m I/2*10-7 wb-T/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 85.5 95.5 105.2 102.5 85.5 95.5 105.2 102.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The only place where slip ring induction motors used in thermal power plants is none of above. coal handling plant. conveyors. lubrication oil pumps. none of above. coal handling plant. conveyors. lubrication oil pumps. ANSWER DOWNLOAD EXAMIANS APP