Power Systems Find the number of strands of ACSR conductor for 4 layer transmission line? 29 7 1 37 29 7 1 37 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is more than the sending end voltage any of the above less than the sending end voltage equal to the sending end voltage more than the sending end voltage any of the above less than the sending end voltage equal to the sending end voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems Characteristics of arc quenching medium is/are High thermal conductivity Non flammable High dielectric strength All of these High thermal conductivity Non flammable High dielectric strength All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.5 0.75 1 0.6 0.5 0.75 1 0.6 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect can be compensated by which of the following both 1 and 2 series capacitor shunt capacitor shunt reactor both 1 and 2 series capacitor shunt capacitor shunt reactor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of high energy loss from turbine exhaust to condenser. high energy loss in boiler. low alternative efficiency. low steam turbine mechanical efficiency. high energy loss from turbine exhaust to condenser. high energy loss in boiler. low alternative efficiency. low steam turbine mechanical efficiency. ANSWER DOWNLOAD EXAMIANS APP