• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
The insulator thickness on the conductor, in cables depends upon

 reactive power
 current
 voltage
 power factor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A moderator material should have

 may be any of the above.
None of these
 large atomic mass.
  small atomic mass.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a regenerative cycle, feed water is heated by

 exhaust gas.
  drained steam from turbine.
 all of above.
 heaters.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The 1st nuclear plant in world was commissioned in

  U.S.S.R.
  UAE.
  U.S.A.
 U.K.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Reheat cycle in thermal power plant is used to

  increase thermal efficiency.
 reduce loss of heat.
 utilize heat of flue gases.
 improve condenser performance.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a thermal power plant, which of its following components needs maximum maintenance attention

 Super heater.
 Condenser.
 Boiler.
 Steam turbine.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑