Power Systems The insulator thickness on the conductor, in cables depends upon reactive power current voltage power factor reactive power current voltage power factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Farakka. Katwa. Durgapur. Bakreshwar. Farakka. Katwa. Durgapur. Bakreshwar. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 10. 15. 50. 25. 10. 15. 50. 25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If in a line, resistance and reactance are found to be equal and regulation is zero, then load will have 0.707 leading power factor zero power factor unity power factor 0.707 lagging power factor 0.707 leading power factor zero power factor unity power factor 0.707 lagging power factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of restricting voltage depends upon the Inductance of the system. Inductance and capacitance of the system. Capacitance of the system. Type of CB. Inductance of the system. Inductance and capacitance of the system. Capacitance of the system. Type of CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are used for protection of equipment from external lightning protection of equipment from open circuits protection of equipment from short circuits All of these protection of equipment from external lightning protection of equipment from open circuits protection of equipment from short circuits All of these ANSWER DOWNLOAD EXAMIANS APP