Power Systems Which of following is a medium and low head turbines Francis and Kaplan turbines. Pelton and Kaplan turbines. Kaplan and Francis turbines. None of above. Francis and Kaplan turbines. Pelton and Kaplan turbines. Kaplan and Francis turbines. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 250 MW 1250 MW 750 MW 500 MW 250 MW 1250 MW 750 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements are true? both 1 and 2 Bus admittance matrix is a sparse matrix nether 1 nor 2 Bus impedance matrix is a full matrix both 1 and 2 Bus admittance matrix is a sparse matrix nether 1 nor 2 Bus impedance matrix is a full matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of off diagonal elements is which is connected between bus i and bus j with positive sign sum of admittances connected at bus j which is connected between bus i and bus j with negative sign sum of admittances connected at bus i which is connected between bus i and bus j with positive sign sum of admittances connected at bus j which is connected between bus i and bus j with negative sign sum of admittances connected at bus i ANSWER DOWNLOAD EXAMIANS APP
Power Systems Bundled conductors in EHV transmission lines increase capacitance increase inductance decrease capacitance decrease inducatance increase capacitance increase inductance decrease capacitance decrease inducatance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Highest pressure generating pump inside the thermal plant is high pressure heater low pressure heater All of these boiler feed pump high pressure heater low pressure heater All of these boiler feed pump ANSWER DOWNLOAD EXAMIANS APP