Power Systems Which of the following faults is/are treated as external faults? All of these Failure of prime mover of the generator Over voltage Failure of excitation All of these Failure of prime mover of the generator Over voltage Failure of excitation ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is compensated with shunt capacitance Csh. After shunt compensation surge impedance loading will decreases remains unaffected None of these increases decreases remains unaffected None of these increases ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 200 - 205 mm. 40 mm. 300 mm. 20 - 25 mm. 200 - 205 mm. 40 mm. 300 mm. 20 - 25 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 52 MW. 57.5 MW. 53 MW. 51.61 MW. 52 MW. 57.5 MW. 53 MW. 51.61 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 250 MW 750 MW 1250 MW 500 MW 250 MW 750 MW 1250 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conversion ratio of a breeder reactor is none of above. equal to unity. less than unity. more than unity. none of above. equal to unity. less than unity. more than unity. ANSWER DOWNLOAD EXAMIANS APP