Power Systems Transmission line has a length of 300 km, operating at sending end voltage Vs = 1 pu, find the receiving end voltage(Vr) at no load? 1.098 pu 0.98 pu 1 pu 0.098 pu 1.098 pu 0.98 pu 1 pu 0.098 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 6 8 2 5 6 8 2 5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 15. 10. 25. 50. 15. 10. 25. 50. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.83. 0.44. 0.25. 1.3. 0.83. 0.44. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An hydro-graph indicates All of these the maximum and minimum run off during the period. the discharge at any time during the period under consideration. the average run off during the period. All of these the maximum and minimum run off during the period. the discharge at any time during the period under consideration. the average run off during the period. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? series capacitor both 1 and 2 shunt capacitor shunt reactor series capacitor both 1 and 2 shunt capacitor shunt reactor ANSWER DOWNLOAD EXAMIANS APP