Power Systems For loss less line, find the ratio of length to the wave length of a signal for a phase shift of 0.05 radians? 7.95 × 10-3 7.95 × 10³ 2 × 10-3 8 × 10³ 7.95 × 10-3 7.95 × 10³ 2 × 10-3 8 × 10³ ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.44. 0.83. 0.25. 1.3. 0.44. 0.83. 0.25. 1.3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of power system is/are Reliable power has to be available Flexible power has to be available. Cost of electrical energy per KWh is to be minimum All of these Reliable power has to be available Flexible power has to be available. Cost of electrical energy per KWh is to be minimum All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Length of short transmission line is up to 150 km 40 km 80 km any of the above 150 km 40 km 80 km any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Three generators rated 100 MVA, 11 kV have an impedance of 0.15 pu each. If in the same plant, these generators are being replaced by a single equivalent generator, the effective impedance of equivalent generator will be 0.15 pu 0.45 pu 0.25 pu 0.05 pu 0.15 pu 0.45 pu 0.25 pu 0.05 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The internal flux linkage due to internal flux of a conductor is I/2*10-7 wb-T/m I/4*10-7 wb-T/m All of these I/6*10-7 wb-T/m I/2*10-7 wb-T/m I/4*10-7 wb-T/m All of these I/6*10-7 wb-T/m ANSWER DOWNLOAD EXAMIANS APP