A 3-phase breaker is rated at 2000 MVA, 33 kV, its making current will be

 70 kVA.
  89.22 kVA.
  35 kVA.
 49 kVA.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A loss less transmission line has a length of 600 km, find the phase shift of voltage signal?

 36°
 90°
 45°
 42°

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is/are base load plants?

 thermal plants
All of these
 hydro plants
 nuclear plants

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
With reference to hydrometer station, the graphical representation of the discharge as function of time is known as

  Hydro-graph.
 Hectograph.
 Load duration curve.
 Monograph.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

 Thermal power plant.
 Nuclear power plant.
 Gas turbine plant.
  Hydro electric power plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
One fission of U235 releases energy of

 525 MeV.
 335 MeV.
 435 MeV.
  200 MeV.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑