Power Systems A 3-phase breaker is rated at 2000 MVA, 33 kV, its making current will be 70 kVA. 89.22 kVA. 35 kVA. 49 kVA. 70 kVA. 89.22 kVA. 35 kVA. 49 kVA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line has a length of 600 km, find the phase shift of voltage signal? 36° 90° 45° 42° 36° 90° 45° 42° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are base load plants? thermal plants All of these hydro plants nuclear plants thermal plants All of these hydro plants nuclear plants ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Hydro-graph. Hectograph. Load duration curve. Monograph. Hydro-graph. Hectograph. Load duration curve. Monograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Nuclear power plant. Gas turbine plant. Hydro electric power plant. Thermal power plant. Nuclear power plant. Gas turbine plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems One fission of U235 releases energy of 525 MeV. 335 MeV. 435 MeV. 200 MeV. 525 MeV. 335 MeV. 435 MeV. 200 MeV. ANSWER DOWNLOAD EXAMIANS APP