Power Systems String efficiency depends upon voltage rating of one SCR. no. of SCR in the string. voltage rating of whole string. all of these. voltage rating of one SCR. no. of SCR in the string. voltage rating of whole string. all of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 4 bus power system consists of 4 transmission lines, then find the sparsity of Y bus matrix? 0.75 0.25 0.5 0.4 0.75 0.25 0.5 0.4 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? In case of parallel transmission lines both 1 and 3 fault current increases fault current reduces stability increases both 1 and 3 fault current increases fault current reduces stability increases ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of re-striking voltage is dependent upon resistance of the system only capacitance of the system only inductance of the system only both 1 and 2 resistance of the system only capacitance of the system only inductance of the system only both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A three phase, 33 kV oil circuit breaker is rated 1200 A, the symmetrical breaking capacity is 2000 MVA, 3 secs. Then the making capacity is 5200 MVA. 5000 MVA. 5100 MVA. 5500 MVA. 5200 MVA. 5000 MVA. 5100 MVA. 5500 MVA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A penstock is used as a condition between none of above. the turbine and discharge drain. the dam and the turbine in a hydro station. the heat ex-changer and the turbine in nuclear power plant. none of above. the turbine and discharge drain. the dam and the turbine in a hydro station. the heat ex-changer and the turbine in nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP