Power Systems When is the ferranti effect on long overhead lines experienced? The power factor is unity The line is heavily loaded The line is fully loaded The line is lightly loaded The power factor is unity The line is heavily loaded The line is fully loaded The line is lightly loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 20 sec. none of these. 10 sec. 5 sec. 20 sec. none of these. 10 sec. 5 sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is low high very high can't say low high very high can't say ANSWER DOWNLOAD EXAMIANS APP
Power Systems The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor? 25% 50.5% 62.5% 75% 25% 50.5% 62.5% 75% ANSWER DOWNLOAD EXAMIANS APP
Power Systems More efficient plants are used as peak load plant both 1 and 2 None of these base load plant peak load plant both 1 and 2 None of these base load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems In nuclear chain fission reaction each neutron causing fission produces at least one new neutron. less than one new neutron. one new neutron. no new neutron. at least one new neutron. less than one new neutron. one new neutron. no new neutron. ANSWER DOWNLOAD EXAMIANS APP