Power Systems Advantages of pumped storage plants is/are used as load frequency control All of these most economical as a peak load supply plant operating time is minimum used as load frequency control All of these most economical as a peak load supply plant operating time is minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is None of these 1 -1 0 None of these 1 -1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Nuclear power station. Thermal power station. Pumped storage. Power station. Nuclear power station. Thermal power station. Pumped storage. Power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is 800 MW 400 MW 1600 MW 200 MW 800 MW 400 MW 1600 MW 200 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two insulator discs of identical capacitance value C make up a string for a 22 kV, 50 Hz, single phase overhead line insulation system. If pin to earth capacitance is also C, then find the string efficiency? 75% 90% 50% 86%% 75% 90% 50% 86%% ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to convert kinetic energy of water. all of above. reduce water hammer. increase flow rate of water. convert kinetic energy of water. all of above. reduce water hammer. increase flow rate of water. ANSWER DOWNLOAD EXAMIANS APP