Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. air preheater. superheater. economizer. ash handling point. air preheater. superheater. economizer. ash handling point. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where air circuit breakers are used? Up to 66 kV. Up to 12 kV. Up to 11 kV. Up to 33 kV. Up to 66 kV. Up to 12 kV. Up to 11 kV. Up to 33 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° â„§. Find Charging current under no load? 0.344∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase 0.344∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz. The number of poles required in the alternator is 8 10 20 4 8 10 20 4 ANSWER DOWNLOAD EXAMIANS APP
Power Systems String efficiency depends upon all of these. voltage rating of whole string. no. of SCR in the string. voltage rating of one SCR. all of these. voltage rating of whole string. no. of SCR in the string. voltage rating of one SCR. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as series capacitor any of the above shunt reactor shunt capacitor series capacitor any of the above shunt reactor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP