Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. air preheater. superheater. ash handling point. economizer. air preheater. superheater. ash handling point. economizer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The amount of ash content in Indian coal 20 %. 35 %. 60 %. 45 %. 20 %. 35 %. 60 %. 45 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage and current instantaneous values are given as 5 sin (ωt + 30°) pu and 2 sin (ωt - 15°) pu respectively. Find the per unit active power? 5.353 pu 3.535 pu 7 pu 5 pu 5.353 pu 3.535 pu 7 pu 5 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 85.5 102.5 95.5 105.2 85.5 102.5 95.5 105.2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 4 layer transmission line? 7 1 37 29 7 1 37 29 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed ( NS ) of turbine is given by N√( P ) / H1.25. none of these. N√( P ) / H2/3. P√( N ) / H3/2. N√( P ) / H1.25. none of these. N√( P ) / H2/3. P√( N ) / H3/2. ANSWER DOWNLOAD EXAMIANS APP