Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. air preheater. superheater. ash handling point. economizer. air preheater. superheater. ash handling point. economizer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 20 MW 80 MW 10 MW 15 MW 20 MW 80 MW 10 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statement is/are true regarding infinite line? It has infinite length It maintains the constant voltage It has infinite voltage both 2 and 3 It has infinite length It maintains the constant voltage It has infinite voltage both 2 and 3 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 4 bus,4×4 Y bus matrix the number of non zero elements are 12. Find the number of transmission lines? 2 4 8 5 2 4 8 5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1-phase transmission line has an impedance (4 + 3j ) Ω. Find the power factor of the load for zero voltage regulation? 0.8 lag 0.8 lead 0.6 lead 0.6 lag 0.8 lag 0.8 lead 0.6 lead 0.6 lag ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following material is not used as fuse element? Carbon. Copper. Aluminium. Silver. Carbon. Copper. Aluminium. Silver. ANSWER DOWNLOAD EXAMIANS APP