Power Systems
For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is

 12.2 kV / μs.
 2.0 kV / μs.
 10.01 kV / μs.
  9.01 kV / μs.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In coal fired thermal power stations, what are the electrostatic precipitators used for?

All of these
 To collect the dust particles from the flue gases
 To keep the air heaters clean
 To remove dust particles setting on the bus bar conductors in the station switch yard

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The draft tube is provided to

 raise the water surface of the stream to create an artificial head.
  increase the acting head on the water wheel.
None of these
 reduce the effect of water hammer.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Gross head of an hydroelectric power station is

 the height of water level in the river where the tail race is provided.
 all of above.
 the height of water level in the river where the storage is provided.
  the difference of water level between the level in storage and tail race.

ANSWER DOWNLOAD EXAMIANS APP