Power Systems Maximum power transfer in a transmission line can be obtained by None of these increasing voltage level either 1 or 2 reducing reactance None of these increasing voltage level either 1 or 2 reducing reactance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Proximity effect is more in case of None of these over head lines power cables same in both cases None of these over head lines power cables same in both cases ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Condenser. Steam turbine. Super heater. Boiler. Condenser. Steam turbine. Super heater. Boiler. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Rankine cycle, the work output from a turbine is given by change in temperature between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. change in temperature between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plug setting of a relay can be altered by varying air gap of magnetic path. adjustable back up stop. no. of ampere-turns. none of these. air gap of magnetic path. adjustable back up stop. no. of ampere-turns. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase breaker is rated at 2000 MVA, 33 kV, its making current will be 35 kVA. 49 kVA. 89.22 kVA. 70 kVA. 35 kVA. 49 kVA. 89.22 kVA. 70 kVA. ANSWER DOWNLOAD EXAMIANS APP